Hive Cluster Status 10/3/2019

This morning we noticed that the Hive nodes were all marked offline. After a short investigation, it was discovered that there was an issue with configuration management, which we have since corrected. Ultimately, the impact from this should be negligible, as jobs that were running continued accordingly, while queued jobs were simply held until resources became available. After our correction, these jobs started as expected. Nonetheless, we want to ensure that the Hive cluster provides performance and reliability as expected, so if you find any problems in your workflow due to this minor hiccup, or for any problems you encounter moving forward, please do not hesitate to send an email to pace-support@oit.gatech.edu.

OIT Planned Maintenance

The OIT Network Services team will be performing a software upgrade on our campus Carrier-Grade NAT (CGN) appliances this week – see OIT Status for a full description. The affected subnet is the out of band management of the Hive/MRI servers; additionally, only internet-bound connections are being serviced. As such, no failures are expected for users of the Hive/MRI servers. Nonetheless, if you encounter connectivity issues to Hive resources, please do not hesitate to contact pace-support@oit.gatech.edu for assistance.

Data center maintenance

Beginning tomorrow morning (9/18/19), there will be urgent maintenance on the cooling system in the Rich data center, which houses all PACE clusters except for Hive. A temporary cooling unit has been installed, but should the secondary cooling unit fail, the room will begin to heat.  If that happens, portions of the data center will need to shut down until the temperature has returned to an acceptable level.  If the clusters are shut down, this will terminate any running jobs on the compute nodes.
Please follow updates on this maintenance and find a full list of affected services across campus at https://status.gatech.edu/pages/maintenance/5be9af0e5638b904c2030699/5d7fd6219012a0316b71ef83.
– PACE team

[Resolved] Shared Clusters Scheduler Down

[Update – 9/10/2019 3:52 PM]

The shared scheduler has been restored to functionality. The issue stemmed from a large influx of jobs (>100,000) in less than 24 hours. As a reminder, the upcoming policy change on October 29, 2019, which limits the number of job submissions to 500 per user, is designed to mitigate this issue moving forward. If you feel your workflow may be impacted, please take the opportunity to read the documentation on parallel job solutions (job arraysGNU parallel and HTC Launcher) developed and put in place for users to quickly adapt their workflows accordingly. Currently, we have the following consulting sessions scheduled, with additional ones to be provided (check back for updates here).

Upcoming Consulting sessions:

  • September 24, 1:00pm – 2:45pm, Molecular Sciences and Engineering Room 1201A
  • October 8, 1:00pm – 2:45pm, Molecular Sciences and Engineering Room 1201A
  • October 22, 1:00pm – 2:45pm, Molecular Sciences and Engineering Room 1201A

Again, the changes listed above will take effect on October 29, 2019.  After October 29, users will not be able to submit more than 500 jobs.

[Original]

The shared scheduler experienced an out-of-memory issue this morning at 7:44 AM, resulting in a hold on all jobs in the queues managed by this scheduler. This issue affects all users who submit jobs to PACE via the shared clusters headnodes (login-s). Currently you will experience hanging jobs when submitting a job. We ask that you refrain from submitting any new jobs until further notice while PACE team investigates the matter and restores functionality to the scheduler.

Currently the following queues are affected by this scheduler issue: apurimac-6,apurimacforce-6,b5-6,b5-prv-6,b5force-6,bench-gpu,benchmark,biobot,biocluster-6,bioforce-6,biohimem-6,casper,cee,ceeforce,chem-bigdata,chemprot,chemx,chemxforce,cns-24c,cns-48c,cns-6-intel,cnsforce-6,critcel,critcel-prv,critcelforce-6,cygnus,cygnus28,cygnus64-6,cygnusforce-6,cygnuspa-6,dimer-6,dimerforce-6,ece,eceforce-6,enveomics-6,faceoff,faceoffforce-6,flamel,flamelforce,force-6,force-gpu,gaanam,gaanam-h,gaanamforce,gpu-eval,habanero,habanero-gpu,hummus,hydra-gpu,hydraforce,hygene-6,hygeneforce-6,isabella-prv,isblforce-6,iw-shared-6,joe,joe-6,joe-bigshort,joe-fast,joe-test,joeforce,kastella,kastellaforce-6,lfgroup,math-6,mathforce-6,mcg-net,mcg-net-gpu,mday-test,metis,micro-largedata,microcluster,optimus,optimusforce-6,prometforce-6,prometheus,pvh,pvhforce,romberg,rombergforce,sagan,sonar-6,sonarforce-6,spartacus,spartacusfrc-6,spinons,spinonsforce,threshold,try-6,trybuy

We apologize for this inconvenience, and we appreciate your attention and patience.

The Launcher Documentation Available

The Launcher (link) is a framework for running large collections of serial or multi-thread applications as a single job on a batch-scheduled HPC system. The Launcher was developed at the Texas Advanced Computing Center (TACC) and has been deployed at multiple HPC centers throughout the world. The Launcher allows High-Throughput Computing users to take advantage of the benefits of scheduling larger single jobs and to better fit within the HPC environment. 

To better serve our High-throughput Computing users, we have adapted this software for use on the PACE systems.

Information on using Launcher on PACE is available at PACE Documentation.

COMSOL use at PACE

As you may know, the College of Engineering is changing the licensing model for COMSOL on September 16, 2019, and will now restrict access for research use to named users who have purchased access through CoE. Use of COMSOL for research on PACE is licensed through CoE (regardless of your college affiliation). If you or your PI have not yet made arrangements with CoE, please contact Angelica Remolina in CoE IT (angie.remolina@coe.gatech.edu). You will not be able to run COMSOL on PACE without permission from CoE after September 16.

[Resolved] Campus Network Down

[Update] September 5

OIT reports that the campus network is again fully functional.

[Update] September 4 4:28 PM

This is brief update,  OIT Network Services has identified the cause of the campus network issues.  One of the enterprise routers for campus rebooted unexpectedly that impacted our campus network.  Since this event, the network has been stabilized.  OIT continues to monitor this situation for any further issues.  For latest update, please check on OIT status page.

As for PACE cluster(s), you should be able to access the cluster(s) without issues.  If you continue to experience an issue, please try to disconnect and reconnect to restore your connectivity.

As always, if you have any questions or concerns, please don’t hesitate to contact us at pace-support@oit.gatech.edu

[Original] September 4 2:30 PM

Our campus network is down.  OIT is investigating this incident, and you may check on the details from the link below:

https://status.gatech.edu/pages/incident/5be9af0e5638b904c2030699/5d6ff4f4daca6a0543918df2

This incident will prevent you from accessing the PACE resources, but your current jobs running on PACE should not be interrupted.

Please check the status link above for up to date details.  If you have any questions, please send us a note to pace-support@oit.gatech.edu.  Also note, we are impacted by the outage and our responses to your email will be delayed.

Thank you for your patience.

The First LIGO Cluster for Georgia Tech is Ready for Research!

Tech’s Partnership for an Advanced Computing Environment (PACE) recently deployed a cluster to support the Nobel Prize winning Laser Interferometer Gravitational-Wave Observatory (LIGO) project. This project observed the first gravitational waves from the merger of two black holes, and, in doing so, confirmed Einstein’s predictions according to his theory of general relativity. Beyond the addition of new computational resources, this pioneering work is the first step in integrating Georgia Tech into the Open Science Grid (OSG national computational grid that provides shared resources to run massive numbers of small computations.

PACE started working on building a LIGO resource at Georgia Tech shortly after the arrival of Dr. Laura Cadonati, professor of Physics in the Center for Relativistic Astrophysics (CRA), in 2015. The initial proof-of-concept infrastructure was able to accept test jobs from OSG for testing. This initiative yielded great insight into the process of integrating into OSG, and was disseminated to other institutions such as Syracuse University, who subsequently was able to deploy their own cluster. Based on this successful test, Cadonati procured a new cluster to run production level LIGO workloads. In deploying this cluster, PACE partnered with a team of experts at the University of Chicago led by Senior Scientist Robert Gardner to adopt the latest advancements in OSG system and software stack.

Policy Update to Shared Clusters’ Scheduler

Dear Researchers,

Given the growth in the number and workload diversity of PACE cluster users, we are compelled to make adjustments to our shared clusters’ scheduler policy that will help offset the extensive load our schedulers are placed under as a result of rapid growth of our high throughput computing (HTC) user community that is submitting 1000s of jobs at a time.  As you can see in the figure below, our shared cluster is under heaviest load from the sheer volume of HTC jobs it receives from the users that at this time is exceeding 100,000 jobs.  Our current policy for the max number of jobs a user may submit is 3,000.  We are proposing to reduce the max number of jobs to 500 (i.e., 500 total jobs both queued/running per user) that will substantially reduce the load on the scheduler that will improve the overall performance, providing a sustainable and improved user experience  by largely preventing hanging commands/jobs/errors when attempting to submit/check on a job.

More specifically, we are making the following changes:

  • Max 500 total jobs (queued/running) per user
  • Effective October 29, 2019

Who is impacted:

  • If you are logging into login-s[X] headnode, then this change will impact you.
  • List of queues impacted are as follows: apurimac-6,apurimacforce-6,b5-6,b5-prv-6,b5force-6,bench-gpu,benchmark,biobot,biobotforce-6,biocluster-6,biocluster-gpu,bioforce-6,biohimem-6,casper,cee,ceeforce,chem-bigdata,chemprot,chemx,chemxforce,chowforce-6,cns-24c,cns-48c,cns-6-intel,cnsforce-6,coc,coc-force,critcel,critcel-burnup,critcel-manalo,critcel-prv,critcel-tmp,critcelforce-6,cygnus,cygnus-6,cygnus-hp,cygnus-hp-lrg-6,cygnus-hp-small,cygnus-xl,cygnus24-6,cygnus28,cygnus64-6,cygnusforce-6,cygnuspa-6,davenprtforce-6,dimer-6,dimerforce-6,ece,eceforce-6,enveomics-6,faceoff,faceoffforce-6,flamel,flamelforce,force-6,force-gpu,force-single-6,gaanam,gaanam-h,gaanamforce,gemini,ggate-6,gpu-eval,gpu-recent,habanero,habanero-gpu,hummus,hydraforce,hygene-6,hygeneforce-6,isabella,isabella-prv,isblforce-6,iw-shared-6,jangmse,joe,joe-6,joe-bigshort,joe-fast,joe-test,joeforce,kastella,kastellaforce-6,kokihorg,lfgroup,math-6,math-magma,mathforce-6,mayorlab_force-6,mcg-net,mcg-net-gpu,mcg-net_old,mday-test,medprintfrc-6,megatron-elite,megatronforce-6,metis,micro-largedata,microcluster,nvidia-gpu,optimus,optimusforce-6,phi-shared,prometforce-6,prometheus,pvh,pvhforce,radiance,romberg,rombergforce,sagan,sonar-6,sonarforce-6,spartacus,spartacusfrc-6,spinons,spinonsforce,threshold,threshold-6,tmlhpc,try-6,trybuy
  • We identified 84 users from 36 PI groups out of our nearly 3000 users from nearly 300 PI research groups who will be impacted by this change.

We understand that this is a drastic decrease in the limit of jobs a user is able to submit, but with our proposed improvements to your workflows, you will benefit from improved performance of the scheduler and gain more computational time from more efficiently submitting jobs.  With that said, we are providing a custom consulting sessions to help the researchers adopt their workflows to the new limits for max jobs submission. Also, we have multiple solutions, for example, job arraysGNU parallel and HTC Launcher developed and put in place for users to quickly adapt their workflows given this policy update. Currently, we have the following consulting sessions scheduled, with additional ones to be provided (check back for updates here).

Upcoming Consulting sessions:

  • September 10, 1:00pm – 2:45pm, Molecular Sciences & Engineering Room 1201A
  • September 24, 1:00pm – 2:45pm, Molecular Sciences and Engineering Room 1201A
  • October 8, 1:00pm – 2:45pm, Molecular Sciences and Engineering Room 1201A
  • October 17, 10:00am – 11:00am, Scheller COB 224
  • October 22, 1:00pm – 2:45pm, Molecular Sciences and Engineering Room 1201A

Again, the changes listed above will take effect on October 29, 2019.  After October 29, users will not be able to submit more than 500 jobs.

If you have any questions or concerns, please do not hesitate to contact us at pace-support@oit.gatech.edu

Best,

The PACE Team